Skip to content

See your roof's next big expense coming. Free inspection

(317) 751-7467
(317) 751-7467

ServicesRoof Replacement

Roof Replacement in McCordsville

We replace roofs on a timeline you choose, not one a leak forces on you. It starts with a free roof inspection, honest notes on how much life your current roof has left, and a written estimate you can budget around before any work is scheduled.

Two roofers kneeling on a flat garage roof, one unrolling white TPO membrane and one heat-welding a seam, with gray vinyl siding and a window behind them

A new roof, planned before it becomes urgent

Most roofs give plenty of warning before they fail. Granules wash into the gutters, shingle edges begin to lift, and a small stain appears on a ceiling. When we catch those signs early, you have time to compare materials, line up financing if you want it, and pick a dry week in spring or fall instead of scrambling after a winter storm.

Replacement is the right call when repairs have stopped buying real time: the shingles are near the end of their service life, the decking is softening, or leaks keep returning in new places. If a targeted roof repair will honestly carry your home another few years, we will tell you so and show you the photos that back it up.

A full replacement is a large decision, and you should know who will be on your roof before anyone climbs a ladder. Roofing Mccordsville is licensed, bonded and insured, and we hold an A+ BBB rating.

What a full replacement includes

Complete tear-off to the deck
We remove every existing layer down to the wood. That is the only way to see the decking clearly and give the new roof a flat, sound surface to fasten into.
Decking check and replacement
Soft or delaminated sheathing gets cut out and replaced with new board. We photograph what we find and walk you through any added sheets before we install them.
Ice barrier and underlayment
Self-adhering ice and water membrane goes along the eaves and in the valleys, where freeze-thaw cycles push meltwater under shingles. Synthetic underlayment covers the rest of the deck.
New flashing and drip edge
Chimneys, walls, pipe boots and skylights get fresh flashing rather than reused metal. Drip edge at the eaves and rakes guides water cleanly into the gutters.
Balanced attic ventilation
Fresh air should enter low along the eaves and leave high near the peak. We measure how much of each your attic has and add or adjust vents until the two match, so trapped heat and moisture stop wearing the shingles from underneath.
Protection and nail pickup
Tarps cover shrubs, flower beds and the walls of your home while old shingles come down. Before the crew leaves each evening, the yard is raked clear and a rolling magnet goes over the grass, beds and driveway to catch loose nails.

Signs it is time to start planning

  • Granules in the gutters

    Asphalt shingles shed their mineral coating as they age. Heavy buildup at downspout outlets means the shingles are losing their protection from the sun.

  • Curling or cupped shingles

    Edges that lift or centers that sink point to shingles drying out. Wind gets under them easily, and replacements rarely match the faded originals.

  • Leaks that keep moving

    One leak can be a repair. When a fix in one spot is followed by a stain somewhere else, the whole system is usually wearing out.

  • A spongy feel or sagging lines

    A deck that gives underfoot or a ridge that dips suggests moisture has reached the wood. That is worth looking at before the next heavy snow load.

  • Two layers already on the roof

    If an earlier roofer installed shingles over an old layer, the next roof needs a full tear-off. Knowing that early helps you budget accurately.

How the work runs, from first visit to final walk-through

  1. 1

    Free inspection and photos

    We go up on the roof and into the attic where we can reach it, then show you photos of what we saw. You get a plain answer on whether to repair now or plan a replacement.

  2. 2

    Written estimate and planning

    You receive a line-item estimate covering materials, decking allowances, flashing and ventilation. We talk through timing and financing so you can choose a season that fits your budget.

  3. 3

    Permit and material delivery

    We pull the permit where your town requires one and schedule delivery shortly before work begins. Materials are staged to keep your driveway as usable as possible.

  4. 4

    Installation day

    Most single-family homes are torn off, dried in and reshingled in one to two days, weather allowing. We never strip more roof than we can cover the same day.

  5. 5

    Final walk-through

    We inspect the finished roof with you, check the gutters and grounds, and answer any questions before we leave.

Roofer on an aluminum ladder checking shingles at the eave of a brick and vinyl two-story home while a homeowner watches from the front lawn

What shapes the cost of a new roof

Every estimate we write is itemized, so you can see where each dollar goes and plan around it. Size, steepness and the condition of the wood under the old shingles move the number most. If you would rather spread the cost out, we offer financing and can explain the options while we review your estimate.

Square footage and slope
More roof area means more bundles, more underlayment and more hours on the job. A steep pitch adds harnesses and roof jacks, and the crew simply moves slower on it.
Layers and decking condition
Stripping two layers takes longer than stripping one. Rotted sheathing is replaced sheet by sheet, and we list that as an allowance in the estimate so it never arrives as a surprise.
Material choice
Architectural shingles, upgraded impact-rated lines and metal roofing each sit at different levels. We can price more than one option so you can compare them side by side.
Details and penetrations
Chimneys, skylights, dormers and valleys each add flashing work. Correcting poor ventilation can also add to the scope.
Timing
Planning ahead lets you choose mild weather and a calendar slot that suits you, rather than paying for work squeezed in after a failure.

Roof replacement questions

Something not covered here? (317) 751-7467

Can the new roof go right over the shingles I have now?

We advise against it and remove the old roof down to the deck instead. An extra layer hides soft decking, adds weight to the framing and tends to shorten the life of the new shingles. If two layers are already up there, both have to come off before a new roof goes on.

What time of year is best for a replacement?

Spring and fall work best because shingles seal well in moderate temperatures and the weather is easier to plan around. We also work through summer and on mild winter days. Booking a few months out gives you the widest choice of dates.

How do I know if I need a replacement or just a repair?

The free inspection answers that. We look at shingle age, granule loss, flashing, decking and past leak spots, then show you the photos. If a roof repair makes more sense, we will tell you.

Will my homeowner's policy pay for a new roof?

Policies usually cover sudden damage such as hail or wind, not a roof that has simply worn out with age. If storm damage is part of the picture, we can document what we find and work with you and your carrier on the claim. Our storm damage repair page explains how that works.

Do you offer financing?

Yes, financing is available. Once you have your written estimate in hand, we can explain the payment options side by side so you can pick the one that fits your budget.

Do you work outside McCordsville?

Yes. We replace roofs in nearby towns including Fortville, Fishers, Greenfield and Pendleton. Our service areas page lists the rest.

Aerial view of a brick ranch home with a new charcoal shingle hip roof, valleys and vents, a ladder against the garage eave and tarped debris on the driveway

Plan your next roof while you still have time to choose

A free roof inspection tells you how many good years your current roof has left and what a replacement would involve. From there, the timing is yours.